Opel Omega

since 1993-1999 release

Repair and operation of the car



Opel Omega
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Repair of engines
   + 3.1. SOHC engines of 2,0 liters
   + 3.2. DOHC engines of 2,0 liters
   + 3.3. 2,5 and 3,0 liters engines
   - 3.4. Partition of all petrol engines
      3.4.1. Technical characteristics
      3.4.2. Check of a compression
      + 3.4.3. Engine partition
      3.4.4. Auxiliary elements of the engine
      - 3.4.5. Engine
         3.4.5.1. Dismantle of the power unit
         3.4.5.2. Removal and installation of the engine
      3.4.6. Engine partition
      3.4.7. Head of cylinders and valves
      3.4.8. Pistons and rods
      3.4.9. Bent shaft
      3.4.10. Block of cylinders
      3.4.11. Radical bearings and bearings of rods
      3.4.12. Piston rings
      3.4.13. The first start of the engine after a partition
   + 3.5. 2,0 liters diesel engine
   + 3.6. 2,5 liters diesel six-cylinder engine
+ 4. Heating system and ventilation
+ 5. Fuel, exhaust systems
+ 6. System of start of the engine
+ 7. System of ignition
+ 8. Coupling
+ 9. Transmissions
+ 10. Main transfer, half shafts
+ 11. Brake system
+ 12. Suspension bracket and steering
+ 13. Body
+ 14. Body electric equipment


Сам себе сантехник

3.4.5. Engine

3.4.5.1. Dismantle of the power unit

GENERAL INFORMATION

Methods and safety measures

If the decision on dismantle of the engine for carrying out capital repairs or repair of the main knots was made, then it is necessary to hold certain preparatory activities.

It is extremely important to plan the place in which works will be performed. Undoubtedly, the best place is the workshop. It is very important to have the equipped working platform, and also the place for storage of the car. If there is neither workshop, nor a garage, then also the pure concrete or asphalted platform will be required at least equal.

Washing of a motor compartment and the power unit before dismantle will allow to keep the tool clean and the constant working condition.

Also the floor elevator or a telfer will be necessary. Make sure that these devices have a stock on loading capacity and are capable to lift the engine with transmission. Observance of security measures plays here a paramount role as raising of the engine from the car – operation potentially dangerous.

If works on dismantle of the engine are carried out by the inexperienced person, then the assistant is necessary. Consult and ask to help the persons having experience in such works. There is a set of examples of that as attempts to alone execute dismantle of the engine with raising of the last of a motor compartment came to an end unsuccessfully.

In advance plan the actions. Before beginning works, hire or buy all necessary tools and the equipment. To some devices ensuring safety at dismantle and installation of the engine and also decrease in labor costs, the jack cart of sufficient loading capacity, a full set of keys and mandrels, wooden blocks, rags and solvent for cleaning of inevitable pools from the spilled working liquids of the engine belong (besides the elevator). If the elevator is hired, then agree about it in advance, having performed all works in which this mechanism is not required. It will allow to save money and time.

Keep in mind that considerable time you will not be able to use the car. For performance of some works inaccessible in house conditions due to the lack of the special equipment, it is necessary to address in a workshop of car service. These enterprises work according to the schedule therefore will be expedient to consult there before dismantle of the engine precisely to estimate expenses of time for repair and restoration of details.